My Dublin House

My Dublin House
St. Mary's

Intro

This blog is about our journey restoring and renovating our 'new' very old house in Dublin and how my ideas are reflected and incorporated into the house design. It is not just about design, but how the house will work for us a family with 2 very lively boys and trying to update the house to 21st Century living without taking away the traditional features, charm and history.


Hopefully a happy marriage of Scandi and Irish design and lifestyle!


I hope you will enjoy the journey with me, and feel free to comment at any time or send me an email if you have any question.

_______________________________________________________________________________________________

Showing posts with label Basement. Show all posts
Showing posts with label Basement. Show all posts

Wednesday, 11 March 2015

Progress - slowly


It's been a while, but things are beginning to take shape. As expected it was never going to be an easy journey with such an old property, but so far we have not found any hidden treasures (sadly) or old bones (thankfully) only added costs..... also expected.

Below are a few images of the current state of affairs - still a way to go but can't wait to live there later this Summer, feel so blessed and lucky.

The diggers have gone.


Some re-wiring through 5ft stone walls.
Kitchen nearly ready for fitting - part of chimney gone.


Back walls nearing completion, drains re-routed and all sorts of re-inforcement.
Posh shed foundations in progress.
Basement being tanked, damp proofed you name it - it's being done....
Basement laundry room to be and waiting for new stairs to be re-instated.


Drawing room at it's worst, this is the oldest part of the house - previously a tower within Booterstown Castle. Walls being fixed, new floors to go in and most importantly central heating.
Sample of re-claimed oak floor for the drawing room - minus the mahogany strips though - less is more!

Stud work  for the en-suite taking shape in the Master bedroom - finished off with glass panels up to the ceiling.
 
Master En-suite stud work  from another angle.


Monday, 9 February 2015

Windows & more digging....

Well it's well and truly a building site, lots happening and Barry & his team are working away with lots of machinery on site - much to the boys excitement.

All sash windows have been removed and taken away to be restored, the frames will be restored on site.

The basement is moving ahead slowly but a few issues have cropped up that had to be dealt with and it is now being lined with a special membrane as part of the damp-proofing.

The terracing at the front and back of house is beginning to take shape and soon the mounds of soil and rubble will be levelled out again and we may see a bit of our garden again.


Windows removed for restauration 

Marcus: Mummy can we have a swimming pool?

A bit of Spring amongst the mud & madness of a building site

Front terracing taking shape

Back terracing taking shape as well!

Slow but steady progress.

Basement being damp proofed

Tuesday, 25 November 2014

Basement

Basement Update


The basement had been converted into a 2 bedroom apartment years ago and we are incorporating this back into the house with new stairs and a total renovation.

The basement has now been totally cleared out and ready to be re-modelled. The space is being fully renovated to deal with damp issues and re-configuation which will include a mud room, laundry room, wine cellar, my office and a spare room with an en-suite + lots and lots of storage space.

The space will be designed to allow as much light in as possible with light walls and finished off with a polished concrete floor with underfloor heating throughout.

Wine Cellar to be


The view from 'my office to be' to the garden (at present)

Office to be

Office to be

Laundry Room & Storage + stairs to be re-introduced

Beautiful old stone wall hidden behind plasterboards.